Providing quality products at
competitive pricing requires the implementation of a Quality Program
which permeates the entire organization.
-
Our quality program exceeds the
requirements of MIL-I-45208A.
-
All inventory is coded by part
number, heat number, and lot.
-
Materials in production are
controlled by heat number and work order.
-
Continuous internal audits
provide the source for steady improvement.
Production Quality Control
-
Raw material is inspected upon
receipt and inventoried by heat number. Original mill
certifications are required of all incoming materials at time of
delivery and are verified before acceptance.
-
All production lots are subject
to a first piece inspection following set up, and prior to
production.
-
In process inspection is
conducted continuously by the operator, followed up by the
inspection department. Inspection is conducted in accordance
with SPC standards.
-
Final inspection is carried out
prior to shipment.
-
Sampling plans are developed in
accordance with the requirements of ANSI/ASQC Z14-1993.
-
All inspection equipment is
maintained and controlled in accordance with the requirements of
ANSI/NCSL Z 540-1-1994.
Traceability
|